47. Installation conditions: Construction of a privy is permitted provided the following conditions are met:
(a)  the soil must be high permeability or permeable soil;
(b)  the underground water, bedrock or any layer of impermeable or low permeability soil must be at least 1.2 m below the surface;
(c)  the grade of the site must be less than 30%.
R.R.Q., 1981, c. Q-2, r. 8, s. 47; O.C. 786-2000, s. 46; O.C. 1156-2020, s. 48.
47. Disposal site: Construction of a privy is permitted provided the following conditions are met:
(a)  the soil must be high permeability or permeable soil;
(b)  the underground water, bedrock or any layer of impermeable or low permeability soil must be at least 1.2 m below the surface;
(c)  the grade of the site must be less than 30%.
R.R.Q., 1981, c. Q-2, r. 8, s. 47; O.C. 786-2000, s. 46.